Burriana awards thermal maintenance contract to CLECE to save energy

Published on May 26, 2026 | Translated from Spanish

The Burriana City Council has awarded CLECE FS S.A. the maintenance service for municipal thermal installations. The objective is to improve energy efficiency, reduce costs, and optimize consumption in public buildings, reinforcing the commitment to sustainability and guaranteeing a reliable service for citizens.

Photorealistic engineering visualization of a municipal building exterior, maintenance technician in orange uniform adjusting a large HVAC control panel with digital energy efficiency display, glowing green energy savings metrics on screen, thermal camera showing heat distribution on pipes, smart thermostat being calibrated, modern solar panels on roof visible in background, tools laid out on a clean workbench, dramatic afternoon sunlight streaming through windows, crisp industrial lighting, ultra-detailed mechanical components, technical illustration style, action of optimizing temperature settings during routine inspection, demonstrating sustainable maintenance process

Technical efficiency and consumption control in public buildings 🔧

Managing boilers, air conditioning, and hot water systems requires precise maintenance to avoid energy losses. CLECE FS S.A. will be responsible for periodic inspections, regulation adjustments, and thermal leak detection. The contract includes a monitoring plan to identify consumption deviations, allowing the City Council to make decisions based on real data rather than estimates.

The noble art of not letting the cold sneak into the coffers ☕

Finally, someone will remember that boilers also need affection (and an annual inspection). Now, municipal buildings won't have to choose between heating the employees or paying the electricity bill. Of course, let's hope the contract also includes repairing the coffee machine, because that one is a high-performance thermal installation.