Amazon unveils 960 MW nuclear power plans in Washington to fuel its AI

Published on January 04, 2026 | Translated from Spanish
Revit render of Amazon's modular nuclear complex in Richland, showing Xe-100 reactors, data center, and energy infrastructure, visualized with RTX 4080.

Amazon Unveils 960 MW Nuclear Power Plans in Washington to Fuel Its AI

Amazon has revealed ambitious plans to build a 960-megawatt nuclear power plant in Richland, Washington, specifically designed to meet the growing energy demand of its Artificial Intelligence systems. The project will use state-of-the-art Xe-100 small modular reactors (SMRs), marking a significant trend where tech giants are seeking nuclear solutions to secure large volumes of carbon-free energy to power their compute-intensive data centers. This strategic move positions Amazon at the forefront of the corporate energy transition towards stable and scalable sources. ⚛️

Phase 1: Research and Technical Data Collection

Before opening Autodesk Revit, thoroughly research Xe-100 modular reactors and Amazon's data center infrastructure. Study the technical specifications of the X-energy Xe-100: high-temperature gas-cooled reactor design, 80 MW capacity per unit, and passive safety features. Investigate the topography of Richland, Washington, and the regulatory requirements for nuclear plants. Gather references from: existing nuclear plants, hyperscale data centers, electrical transmission infrastructure, and Xe-100 design technical documentation. This foundation will enable the creation of a technically accurate and regulatorily plausible model.

Key Elements to Research:
  • Xe-100 reactor technical specifications (80 MW per unit)
  • Containment design and nuclear safety systems
  • Amazon hyperscale data center architecture
  • Electrical transmission infrastructure and substations
  • Zoning and security requirements for nuclear facilities
  • Cooling and thermal management systems

Phase 2: Autodesk Revit Setup and Optimization for RTX 4080

Configure Autodesk Revit 2024 to leverage the power of the RTX 4080. Set units to feet/inches (North American standard) and configure appropriate structural and MEP templates. The RTX 4080, with its 16GB of GDDR6X VRAM and 9728 CUDA cores, will enable handling complex BIM models with multiple disciplines without slowdowns. Enable GPU acceleration in graphics preferences and configure Realistic View for real-time preview of materials and lighting.

The RTX 4080 transforms complex BIM modeling into a fluid experience, allowing real-time visualization of industrial-scale facilities.

Phase 3: Site Modeling and Terrain Preparation

Begin by creating the topographic model of the site in Richland. Import USGS elevation data and use the Toposurface tool to recreate the actual terrain. Establish property boundaries and zoning according to nuclear regulations. Model existing infrastructure: access roads, transmission lines, and water bodies for cooling. The power of the RTX 4080 will allow manipulation of complex topographic surfaces with instant updates across all views.

Phase 4: Modular Reactor Complex Design

Model the 12 Xe-100 reactors required to reach 960 MW. Create a parametric nuclear reactor family based on X-energy's specifications. Include all components: reactor vessel, control systems, concrete containment, and operations rooms. Use radial arrays to distribute the reactors optimizing safety and operational efficiency. The RTX 4080 will handle the high level of detail of multiple complex instances without issues.</